Project Controls Intelligence — from P6 to decision

Plan, control, and forecast every project — from one platform.

CoPlanes turns your Primavera P6 schedule and progress updates into deterministic analysis, auditable Early Warnings, and reports your whole team can trust — no black boxes, no invented numbers.

  • Primavera P6 XER import
  • Unified EVM calculations
  • Schedule trend intelligence
  • Auditable Early Warnings
  • Weekly & monthly reports
  • Bilingual Arabic ⇄ English, full RTL
Get StartedSee capabilities
  • XER Import
  • Version Compare
  • DCMA Quality
  • Critical Path
  • S-Curve
  • Earned Value
  • Early Warnings
  • Weekly Reports
  • Monthly Reports
  • Executive Review
Capabilities

Five capabilities, one record.

Each capability reads the one before it. Nothing re-entered, nothing recalculated twice.

Plan

Import a Primavera P6 XER baseline and updates — activities, relationships, WBS — or author a schedule inside the platform.

Control

Track progress, cost and EVM against plan with three-depth dashboards, executive summary down to operational detail.

Analyze

Compare versions, run a DCMA-style quality check, and surface deterministic trend intelligence from the schedule's full history.

Forecast

Turn recurring findings into owned, auditable Early Warnings with a full lifecycle, actions, and escalation.

Report

Weekly and monthly progress reports built from the same data the dashboards read — one source of truth.

Knowledge-grounded schedule generator

From a BOQ to a schedule you can execute.

Every engineering step is auditable — no black box, no AI-picked options you cannot justify.

  1. BOQ uploaded1,240 items
  2. Analyzing scope6 families
  3. WBS generated3 levels
  4. Activities generated482 activities
  5. Logic connected694 relations
  6. Resources assignedBy productivity rates
  7. Validation complete (DCMA)Zero conflicts
Architecture

Three layers — in order.

Each pillar reads the one before it. Nothing skips ahead of the schedule's real history.

01
Schedule Engineering

Version comparison, quality analysis, and trend intelligence built on the schedule's real history — not a one-off snapshot.

02
Project Controls

EVM, S-curves, critical path, and performance indices computed once — the same way, everywhere they appear.

03
Early Warning & Action

A deterministic bridge from analysis to accountability: an owner, a due date, and an audit trail for every concern.

Voices

What do our customers say?

These are placeholder cards. Replace with real quotes from engineers, contractors, and consultancies who use CoPlanes.

"Before CoPlanes, comparing weekly P6 XER files took days of manual work to prepare executive reviews. Now, with a single import, we get an instant, deterministic comparison of critical path shifts and forecast dates without spreadsheet errors."

Eng. Tariq Al-Otaibi
Project Controls Director | Infrastructure

"Running automated DCMA-style schedule quality checks directly in CoPlanes surfaces missing logic and artificial constraints before consultant submission. It has saved us weeks of back-and-forth rejections."

Reem Al-Hashemi
Head of Planning & Monitoring | Tier-1 Contractor

"Aligning schedule progress with actual cost data was always a challenge. CoPlanes gives us a unified, auditable source of truth for our SPI, CPI, and S-Curves that our board can completely rely on."

Samer Najjar, PMP
Cost Control Lead | Real Estate Development

"The Early Warnings engine shifted our team from merely documenting past delays to proactively mitigating risks. It provides clear ownership, tracked action plans, and auditable escalation paths."

Dr. Khaled Al-Mansoor
PMO Director | Mega Programs

"Producing weekly and monthly reports in both Arabic and English used to consume half our team's time. CoPlanes’ native bilingual support and proper RTL reporting saved us countless hours every single month."

Ahmed Abdelaziz
Senior Planning Engineer

"Turning a detailed BOQ into an auditable, executable schedule in record time gave us an incredible competitive edge during tendering and initial mobilization."

Faisal Al-Dossari
Tendering & Contracts Director
FAQ & contact

A quick answer on the left, or message us directly.

We reply within 24 business hours.

Frequently asked questions
What exactly does the platform cover?
CoPlanes is a project-controls intelligence platform: it imports Primavera P6 (XER) schedules and progress updates, then computes EVM, S-curves, critical path, and generates weekly/monthly reports — the same data drives the dashboards and the reports.
How does the Primavera P6 XER import work?
Upload the XER file from Data → Documents. CoPlanes parses activities, relationships, WBS, resources, and calendars, and registers it as a new schedule version that can be compared against prior versions (deterministic — nothing guessed).
What is the difference between "current" and baseline schedules?
Baseline is the originally approved schedule (planned dates). Current is your latest actual update from P6. All EVM, SPI, and CPI calculations compare one against the other — no hand-tuning.
How are Early Warnings managed?
Every Early Warning carries an owner, a due date, and linked actions, with a full lifecycle (open → in progress → closed) and an audit trail. No synthetic "AI score" — just documented engineering decisions.
Can a team work on the same project with different roles?
Yes. Each member holds a per-project role (Viewer / Editor / Admin). There is no global admin — everyone sees only the projects they were added to, each with its own role.
How are weekly and monthly reports generated?
Reports are built from the same data the dashboards read — one source of truth, always. Pick the date, hit Generate, and you get a shareable PDF in the right typography and direction (LTR/RTL).
Mobile / WhatsApp
+966 54 239 8764
Support available Sun–Thu, business hours.
Send your message
Pressing Send opens your email app with a pre-filled message to us.

Ready to see your project's real state?

Sign in with the email your project admin added you with.

Get Started